Reconstruction of Moravská Ostrava spa
Site | Ostrava - Moravská Ostrava |
---|---|
Contractor | Ridera Stavební a.s. Ostrava, Dělnická 382, Ostrava - Poruba |
Investor | Sdružení rekreačních zařízení města Ostravy, s.r.o. |
Designer | Arming spol. s r.o. PROJEKTSTUDIO EUCZ, s.r.o. – Interior design |
Termín realizace | 09/2008 – 07/2009 |
Investment | 87.01 mil. CZK excluding VAT |
Type of structure | Civil amenities - reconstruction |
Characteristics of construction | Reconstruction of the building was carried out in two phases – the inner and outer premises. Within the outdoor area, which was previously affected by subsidence, a complete reconstruction of the outdoor pool was made, including changes of its shape and the addition of water attractions – rock with a waterfall, waterspouts and massage jets, climbing wall and slides. Furthermore, new swimming pool technologies were installed including water treatment plant, the new facility was built with buffet for visitors, season cash counted, children’s playground, padding pool and a new parking lot. The internal area underwent comprehensive modernization and reconstruction of the inner space and outer shell of the building including internal installations. Hydrotherapy and relaxation, wellness operation were modernized with a wide range of services added – conventional steam, aromasteam, salt steam, tepidarium (heated beds), Kneipp pool, sun relaxation, water relaxation and massages. There is also a solar studio and a brand new water cave, built in the former civil protection shelter. There is a small river, massage beds and a room with water music. |