Alcohol detention centre on the premises of the Ostrava Municipal Hospital
Site | Ostrava |
---|---|
Investor | Městská nemocnice Ostrava |
Designer | PPS Kania s.r.o. |
Termín realizace | 01/2023 – 07/2023 |
Investment | 31,2 mil. Kč |
Characteristics of construction | The project is mainly a reconstruction of the interior of the 1st floor without affecting the appearance of the building. The intention of the building modifications is the change of use to an alcohol detention station, which in terms of layout represents the creation of eight detention rooms for a total of 10 patients and a staff workplace. The subject of the reconstruction are, among other things, new electrical, low-current, water, sewage and ventilation systems. A new element will be the cooling of selected areas. The exterior cladding of the street and courtyard facades will be insulated. |