Berounská brána
Site | Beroun |
---|---|
Contractor | Ridera Stavební a.s., Divize Praha, V Korytech 1537/10, Praha 10, stavbyvedoucí: Ing. Jiří Wagner, Ing. Čestmír Hamral |
Investor | CRESTYL real estate, s.r.o. |
Designer | PJ ATELIER s.r.o. |
Termín realizace | 02/2018-12/2020 |
Investment | 548,9 mil. bez DPH |
Type of structure | set of residential and family houses and infrastructure |
Characteristics of construction | The project included the construction of residential villas and family houses including complete engineering infrastructure. In the locality of the centre of Beroun, 10 five-storey apartment buildings with a total of 146 residential units and 42 two-storey terraced houses and semi-detached houses with a brick load-bearing structure, reinforced concrete monolithic ceilings and a flat roof were built in two successive stages. The project was implemented using the Design & Build method . |