Site | Libina |
---|---|
Investor | Eurovia CS, a.s. |
Designer | Moravia Consult Olomouc a.s. |
Termín realizace | 06/2021 – 12/2022 |
Investment | 18,9 mil. Kč |
Type of structure | Civic facilities |
Characteristics of construction | The subject of this construction was the reconstruction and electrification of the monorail line in the section Uničov (outside) – Troubelice-Libina. The railway stations were reconstructed. Troubelice (now only as a switching station without the possibility of passenger clearance) and the railway station Libina. Libina and the intermediate sections Uničov-Troubelice and Troubelice-Libina including the stops Troubelice-střed, Troubelice and Nová Hradečná. The total length of the construction is 13.8 km. |