Electrification and liquefaction of the line Libina – Uničov

Site Libina
Investor Eurovia CS, a.s.
Designer Moravia Consult Olomouc a.s.
Termín realizace 06/2021 – 12/2022
Investment 18,9 mil. Kč
Type of structure Civic facilities
Characteristics of construction

The subject of this construction was the reconstruction and electrification of the monorail line in the section Uničov (outside) – Troubelice-Libina. The railway stations were reconstructed. Troubelice (now only as a switching station without the possibility of passenger clearance) and the railway station Libina. Libina and the intermediate sections Uničov-Troubelice and Troubelice-Libina including the stops Troubelice-střed, Troubelice and Nová Hradečná.

The total length of the construction is 13.8 km.