References

References? They stand behind us. We finish buildings in every detail with superior quality to the very end.

Thomayer Hospital – Hall H – reconstruction of the microbiology department

Site Praha 4 - Krč
Contractor Ridera Stavební a.s., Divize Praha, V Korytech 1537/10, Praha 10 Stavbyvedoucí: Ing. Ladislav Vávra
Investor Thomayerova nemocnice Vídeňská 800, 140 59, Praha 4 – Krč www.ftn.cz
Designer Karlínblok s.r.o., Pernerova 659/31a,186 00, Praha 8
Termín realizace 08/2016 – 06/2017
Investment 29,6 mil. Kč bez DPH
Type of structure Healthcare - reconstruction - listed building
Characteristics of construction

The subject of the public contract is the reconstruction of a part of the pavilion “H” and the reconstruction of the facilities and administration “H1” of the Department of Clinical Microbiology, which are part of the premises of the Thomayer Hospital in Prague 4.

The works within building “H” include internal structural modifications and complete reconstruction of the envelope of the existing building, i.e. in particular new surfaces, media distribution, replica windows and repair and insulation of the existing listed facade of the building.

In the case of the ‘H1’ building, the works include its complete dismantling, including the ecological disposal of asbestos materials, and the construction of a new pavilion made of prefabricated containers.